FAST DRAIN 200

 

Installation – Setup – Instructions

Step 1

The hole in which the channel is to be laid must not be sufficient only for the channel and the drainage pipes, but also for the thickness of the base (H) and the side walls (S).

The measures to be followed are shown in the summary table, in this step, check that the base layer is suitable for the expected load in the collection.

Step 2

The concrete base (H) should be slightly sloped for drainage. In the case of frequent transitions of D 400 and E 600 freight vehicles, it is recommended that the concrete base be reinforced with iron reinforcement mesh Fi 8 15X15 cm

Step 3

Before filling the concrete, set and connect all the channels to avoid the possible asymmetry of the drainage line.

The height of the filling of concrete should be determined according to the thickness of the final layer, so that the finishing layer would be 3 – 5 mm taller than the height of the grid. It is also necessary to lay grids and screw holes before the filling of concrete is done in order to avoid deformation of the channel and the entire line. As in Step 2, reinforce the concrete as needed, depending on the purpose.


OTHER PRODUCTS

FAST DRAIN ZINC 100
FAST DRAIN ZINC 150
FAST DRAIN 150
FAST DRAIN 200

OTHER CATEGORIES

FAST DRAIN ZINC 100
FAST DRAIN ZINC 150
FAST DRAIN 150
FAST DRAIN 200
LINE EXTRACTION